Meter Standards
Changing Standards for Meter Installation
How does this affect you?
The standards for meter installation have recently changed. All installations must now be underground. Please carefully consult our meter standards prior to installation. Note: Peninsula Light’s standards may exceed the national code (your contractor may not be aware of this).
You are also required to obtain an electrical permit from the Washington State Department of Labor & Industries (L&I) prior to installation. L&I’s new address is: 950 Broadway, Suite 200, Tacoma, WA; phone (253) 596-3808.
Click on a link below to download current meter standards:
* Need
Adobe® Reader to view PDF files? The download is free from Adobe.